
Add to Cart
Metal Steel Downspout Roll Forming Machine , Full Automatic Downspout Elbow Machine
1. Application of downspout roll forming machine:
Metal drainage system has the excellent weather fastness. It has the advantages such as simple design, easy installation, safe and durable, elegant.
Our factory is producing the high quality downspout roll forming machines and export to Russia, India, Uzbekistan, Saudi Arabia, Turkey, etc.
It is widely used in the modern villas and multiple raises buildings.
Metal downspout is made by using the color steel or GGPI coils roll-pressing and end-closing, then use the special equipment hit-to-bend and necking.
2. Production Flows of downspout roll forming machine
Uncoiling the sheet---Infeed guiding--Roll forming---Measure length---Cutting the panel--panels to the supporter (option: automatic stacker)
3. Product photo
4. Main components of downspout roll forming machine
Decoiler | 1 Set |
Guiding Equipment | 1 Set |
Roll Forming Unit | 1 Set |
Post Cutting Unit | 1 Set |
Hydraulic Station | 1 Set |
PLC Control System | 1 Set |
Reveiving Table | 1 Set |
5.Technical details of downspout roll forming machine:
Voltage | 380V or 220V |
Warranty | 18 month |
Roller | 20rows |
Forming speed | 12-15m/min |
Dimension(L*W*H) | 8500mm*1200mm*1500mm |
Base | 300H steel |
Diameter of shaft | 70mm |
Roller material | 45# steel or hard chromium plating |
Cutting type | Hydraulic cutting type |
Cutting blade | Cr12 |
Main motor Power(Kw) | 7.5KW |
Color | As your request |
Material thickness | 0.3-0.7mm or As your request |
Material width | 330mm or As your request |
Transmission type | Chain transmission+deceleration motor |
Automation | Full-automatic |
Control system | PLC |
6. Advantages
· Germany COPRA software design
· 5 engineers with more than 20 years experience
· 30 professional technician
· 20 sets advanced CNC production lines on site
· Passionate Team
· Installation engineers can reach your factory within 6 days
· 1.5 years maintenance and whole life technical support
7. Installation service
After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
Installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before seller’s technician's departure.
The buyer should arrange the accommodation, food, and traffic in the destination
Training period: 2 days. (we can supply training on the operation spot if buyer needs)